Project: 1264 Sandaowan Hydropower Project in Gansu Province, P.R. China - Request for post-registration changes
Project 1264 Sandaowan Hydropower Project in Gansu Province, P.R. China
PRC ref PRC-1264-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 May 08 - 30 Apr 15
Assessment opinion Assessment opinion (651 KB)
Revised PDD Revised PDD (723 KB)   Revised PDD - track changes (745 KB)
Supplementary documents
Signed form Signed form (51 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Dec 12 - Approved
Effective approval date: 04 Dec 12
Historic statuses 30 Oct 12 - Published
30 Oct 12 - Summary note being prepared
13 Nov 12 - Awaiting EB decision