16:57 07 Nov 25
Project:
7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia
- Request for post-registration changes
| Project | 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia |
|---|---|
| PRC ref | PRC-7245-002 |
| Process track | Issuance |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
| Applicable crediting period | 15 May 15 - 14 May 25 |
| Assessment opinion |
Assessment opinion (854 KB)
|
| Revised PDD |
Revised PDD (1841 KB)
Revised PDD - track changes (2517 KB)
|
| Supplementary documents |
Appendix 1 - 301395_PRC_ex-ante ER_Asia Mil Methane Recovery_WWT_MY.xlsx (435 KB)
Appendix 2 - CCIPL 772 PRC_ FVR_track chang.pdf (855 KB)
|
| Signed form |
Signed form (7128 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 17 Jun 22 -
Approved
Effective approval date: 17 Jun 22
|
| Historic statuses |
19 May 22 -
Request published |

Assessment opinion
Appendix 1 - 301395_PRC_ex-ante ER_Asia Mil Methane Recovery_WWT_MY.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: