Project: 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia - Request for post-registration changes
Project 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia
PRC ref PRC-7245-002
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 May 2015 - 31 Dec 2019

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 15 May 15 - 14 May 25
Assessment opinion Assessment opinion (854 KB)
Revised PDD Revised PDD (1841 KB)   Revised PDD - track changes (2517 KB)
Supplementary documents Appendix 1 - 301395_PRC_ex-ante ER_Asia Mil Methane Recovery_WWT_MY.xlsx (435 KB)
Appendix 2 - CCIPL 772 PRC_ FVR_track chang.pdf (855 KB)
Signed form Signed form (7128 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 17 Jun 22 - Approved
Effective approval date: 17 Jun 22
Historic statuses 19 May 22 - Request published