Project: 9402 3 MW Wind power project in Madhyapradesh - Request for post-registration changes
Project 9402 3 MW Wind power project in Madhyapradesh
PRC ref PRC-9402-002
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list AMS-I.D. ver. 18 - Grid connected renewable electricity generation
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Jan 20 - 31 Dec 26
Assessment opinion Assessment opinion (173 KB)
Revised PDD Revised PDD (2051 KB)   Revised PDD - track changes (2059 KB)
Supplementary documents
Signed form Signed form (247 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 28 Sep 23 - Approved
Effective approval date: 28 Sep 23
Historic statuses 30 Aug 23 - Request published