07:57 25 Oct 25
Project:
9402 3 MW Wind power project in Madhyapradesh
- Request for post-registration changes
| Project | 9402 3 MW Wind power project in Madhyapradesh |
|---|---|
| PRC ref | PRC-9402-002 |
| Process track | Issuance |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a version of methodology |
| Methodology(ies) list |
AMS-I.D. ver. 18 -
Grid connected renewable electricity generation
|
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Jan 20 - 31 Dec 26 |
| Assessment opinion |
Assessment opinion (173 KB)
|
| Revised PDD |
Revised PDD (2051 KB)
Revised PDD - track changes (2059 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (247 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 28 Sep 23 -
Approved
Effective approval date: 28 Sep 23
|
| Historic statuses |
30 Aug 23 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: