Project: 5962 International water purification programme - Request for post-registration changes
Project 5962 International water purification programme
PRC ref PRC-5962-008
Process track Renewal
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold, Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, A revision to the eligibility criteria pertaining to the demonstration of additionality
Applicable crediting period 16 Nov 19 - 15 Nov 26
Assessment opinion Assessment opinion (506 KB)
Revised PDD Revised PDD (2587 KB)   Revised PDD - track changes (3178 KB)
Supplementary documents
Signed form Signed form (248 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 09 Oct 19 - Approved
Effective approval date: 03 May 19
Historic statuses 26 Aug 19 - Request published