Project: 0259 Trupan Biomass Power Plant in Chile - Request for post-registration changes
Project 0259 Trupan Biomass Power Plant in Chile
PRC ref PRC-0259-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 14 Dec 2010 - 22 Dec 2010

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 02 Sep 10 - 30 Apr 17
Assessment opinion Assessment opinion (2349 KB)
Revised PDD Revised PDD (2541 KB)   Revised PDD - track changes (2904 KB)
Supplementary documents Appendix 1 - 01c0- CP2 Trupan PDD Ver03 (original).pdf (2520 KB)
Appendix 2 - Upload Information for Documents.pdf (14 KB)
Signed form Signed form (60 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Jan 14 - Approved
Effective approval date: 20 Jan 14
Historic statuses 20 Dec 13 - Request published