Project:
0259 Trupan Biomass Power Plant in Chile
- Request for post-registration changes
Project | 0259 Trupan Biomass Power Plant in Chile |
---|---|
PRC ref | PRC-0259-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
|
Applicable crediting period | 02 Sep 10 - 30 Apr 17 |
Assessment opinion | Assessment opinion (2349 KB) |
Revised PDD | Revised PDD (2541 KB) Revised PDD - track changes (2904 KB) |
Supplementary documents |
Appendix 1 - 01c0- CP2 Trupan PDD Ver03 (original).pdf (2520 KB)
Appendix 2 - Upload Information for Documents.pdf (14 KB) |
Signed form | Signed form (60 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 20 Jan 14 -
Approved
Effective approval date: 20 Jan 14
|
Historic statuses |
20 Dec 13 -
Request published |