Project: 1936 “Listrindo Kencana Biomass Power Plant” - Request for post-registration changes
Project 1936 “Listrindo Kencana Biomass Power Plant”
PRC ref PRC-1936-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Feb 2011 - 15 Oct 2011

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 09 - 31 Dec 15
Assessment opinion Assessment opinion (663 KB)
Revised PDD Revised PDD (884 KB)   Revised PDD - track changes (961 KB)
Supplementary documents Appendix 1 - 2013-05-23 MR2 V2 0 clean.pdf (672 KB)
Appendix 2 - PA1936 Consolidated ER calculation Listrindo Year 2011.xlsx (256 KB)
Appendix 3 - PA1936 Raw data Shell received 2011 through WB_incl TN check.xlsx (362 KB)
Signed form Signed form (46 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Sep 13 - Approved
Effective approval date: 13 Sep 13
Historic statuses 13 Aug 13 - Published
13 Aug 13 - Summary note being prepared
23 Aug 13 - Awaiting EB decision