      Project:
      3570 Alto Tuluá Minor Hydroelectric Power Plant
      - Request for post-registration changes
    
					| Project | 3570 Alto Tuluá Minor Hydroelectric Power Plant | 
|---|---|
| PRC ref | PRC-3570-001 | 
| Process track | Issuance | 
| DOE | Earthood | 
| 
          Methodology(ies) and/or Standardized Baseline(s) 
           applied at the post-registration changes  | 
        |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | 
          
            Temporary deviations from the monitoring plan or the monitoring methodology
            
 Permanent changes from the monitoring plan or the monitoring methodology 
 Changes to the project or programme design 
  | 
      
| Applicable crediting period | 01 Jan 12 - 31 Dec 18 | 
| Assessment opinion | 
           Assessment opinion (259 KB)
         | 
      
| Revised PDD | 
           Revised PDD (1780 KB)
           
           Revised PDD - track changes (1619 KB)
         | 
      
| Supplementary documents | |
| Signed form | 
           Signed form (117 KB)
         | 
      
| DOE clarification | |
| VVS version | VVS-PA 2.0 | 
| Current status | 20 Aug 19 -
                      Approved
             
              Effective approval date: 20 Aug 19
             
            
           | 
        
| Historic statuses | 
            
              
                
                22 Jul 19 -
                Request published | 
        