Project: 2712 Humbo Ethiopia Assisted Natural Regeneration Project - Request for post-registration changes
Project 2712 Humbo Ethiopia Assisted Natural Regeneration Project
PRC ref PRC-2712-001
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 02 Dec 2011 - 01 Dec 2017

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Dec 06 - 30 Nov 36
Assessment opinion Assessment opinion (470 KB)
Revised PDD Revised PDD (4916 KB)   Revised PDD - track changes (5112 KB)
Supplementary documents Appendix 1 - TARAM V1.3_HAR_ETHIOPIA_20_October_2018.zip (4602 KB)
Signed form Signed form (124 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 21 Jan 19 - Approved
Effective approval date: 21 Jan 19
Historic statuses 23 Dec 18 - Request published