Project:
6447 Zhejiang Tangcun 32MW Hydropower Project
- Request for post-registration changes
Project | 6447 Zhejiang Tangcun 32MW Hydropower Project |
---|---|
PRC ref | PRC-6447-002 |
Process track | Issuance |
DOE | RINA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 20 Jun 12 - 19 Jun 19 |
Assessment opinion | Assessment opinion (818 KB) |
Revised PDD | Revised PDD (686 KB) Revised PDD - track changes (700 KB) |
Supplementary documents | |
Signed form | Signed form (109 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 03 Jul 15 -
Approved
Effective approval date: 03 Jul 15
|
Historic statuses |
04 Jun 15 -
Request published |