Project: 10090 “Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO) - Request for post-registration changes
Project 10090 “Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO)
PRC ref PRC-10090-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Any consequential changes to the applied methodologies and/or standardized baselines
Applicable crediting period 08 Jan 15 - 07 Jan 25
Assessment opinion Assessment opinion (470 KB)
Revised PDD Revised PDD (1233 KB)   Revised PDD - track changes (1337 KB)
Supplementary documents Appendix 1 - Revised-Estimated_PDD-ER Sheet-05 06 2025.xls (604 KB)
Signed form Signed form (319 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 23 Mar 26 - Approved
Effective approval date: 23 Mar 26
Historic statuses 22 Feb 26 - Request published