Project:
10090 “Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO)
- Request for post-registration changes
| Project | 10090 “Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO) |
|---|---|
| PRC ref | PRC-10090-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 08 Jan 15 - 07 Jan 25 |
| Assessment opinion |
Assessment opinion (470 KB)
|
| Revised PDD |
Revised PDD (1233 KB)
Revised PDD - track changes (1337 KB)
|
| Supplementary documents |
Appendix 1 - Revised-Estimated_PDD-ER Sheet-05 06 2025.xls (604 KB)
|
| Signed form |
Signed form (319 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 3.0 |
| Current status | 23 Mar 26 -
Approved
Effective approval date: 23 Mar 26
|
| Historic statuses |
22 Feb 26 -
Request published |

Assessment opinion
Appendix 1 - Revised-Estimated_PDD-ER Sheet-05 06 2025.xls