Project: 8249 Catalytic abatement of N2O in Nitric Acid Plant of Shiraz Petrochemical Company - Request for post-registration changes
Project 8249 Catalytic abatement of N2O in Nitric Acid Plant of Shiraz Petrochemical Company
PRC ref PRC-8249-001
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 01 Oct 14 - 30 Sep 21
Assessment opinion Assessment opinion (1025 KB)
Revised PDD Revised PDD (1043 KB)   Revised PDD - track changes (1079 KB)
Supplementary documents Appendix 1 - ER-SPC-PRC02-07032019_Ver.07.xlsx (138 KB)
Signed form Signed form (3742 KB)
DOE clarification DOE clarification 1 - PDD-SPC-PRC02-22052019_Ver.10_Clean.pdf (1145 KB)
DOE clarification 2 - PDD-SPC-PRC02-22052019_Ver.10_TC.pdf (1169 KB)
DOE clarification 3 - ER-SPC-PRC02-22052019_Ver.08.xlsx (146 KB)
DOE clarification 4 - 641_PRC_VR_25.05.19 TC.doc.pdf (1029 KB)
DOE clarification 5 - 641_PRC_VR_25.05.19 clean.doc.pdf (1022 KB)
DOE clarification 6 - 641_PRC_VR_19.06.19 Clean.pdf (1048 KB)
DOE clarification 7 - 641_PRC_VR_19.06.19.pdf (1048 KB)
VVS version VVS-PA 2.0
Current status 02 Dec 19 - Rejected
Effective rejection date: 28 Nov 19. Reason (72 KB)
Historic statuses 29 Apr 19 - Published
07 Jun 19 - Awaiting DOE clarifications
20 Jun 19 - DOE clarifications received
10 Oct 19 - Summary note being prepared
11 Oct 19 - Request added to EB105 meeting agenda