Project: 6973 San Antonio El Sitio Wind Power Project - Request for post-registration changes
Project 6973 San Antonio El Sitio Wind Power Project
PRC ref PRC-6973-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 19 Apr 2015
Applicable crediting period 19 Apr 15 - 18 Apr 25
Assessment opinion Assessment opinion (184 KB)
Revised PDD Revised PDD (1617 KB)   Revised PDD - track changes (1855 KB)
Supplementary documents Appendix 1 - EF-2014 Econegocios_V2.xlsx (4001 KB)
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 06 Sep 18 - Approved
Effective approval date: 06 Sep 18
Historic statuses 13 Aug 18 - Published
13 Aug 18 - Summary note being prepared
16 Aug 18 - Awaiting EB decision