Project: 4078 Biomass based power generation project in Maharashtra, India - Request for post-registration changes
Project 4078 Biomass based power generation project in Maharashtra, India
PRC ref PRC-4078-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 26 Jan 11 - 25 Jan 21
Assessment opinion Assessment opinion (258 KB)
Revised PDD Revised PDD (991 KB)   Revised PDD - track changes (1059 KB)
Supplementary documents Appendix 1 - Upload Information for Documents.pdf (14 KB)
Appendix 2 - AA_Energy_SEC.zip (15 KB)
Signed form Signed form (48 KB)
DOE clarification
VVS version VVS 2.0
Current status 19 Aug 14 - Approved
Effective approval date: 14 Aug 14
Historic statuses 10 Jul 14 - Published
10 Jul 14 - Summary note being prepared
24 Jul 14 - Awaiting EB decision