14:31 09 Jan 25
Project:
4078 Biomass based power generation project in Maharashtra, India
- Request for post-registration changes
Project | 4078 Biomass based power generation project in Maharashtra, India |
---|---|
PRC ref | PRC-4078-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 26 Jan 11 - 25 Jan 21 |
Assessment opinion | Assessment opinion (258 KB) |
Revised PDD | Revised PDD (991 KB) Revised PDD - track changes (1059 KB) |
Supplementary documents |
Appendix 1 - Upload Information for Documents.pdf (14 KB)
Appendix 2 - AA_Energy_SEC.zip (15 KB) |
Signed form | Signed form (48 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 19 Aug 14 -
Approved
Effective approval date: 14 Aug 14
|
Historic statuses |
10 Jul 14 -
Published 10 Jul 14 - Summary note being prepared 24 Jul 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: