Project: 3501 Zafarana 8 - Wind Power Plant Project, Arab Republic of Egypt - Request for post-registration changes
Project 3501 Zafarana 8 - Wind Power Plant Project, Arab Republic of Egypt
PRC ref PRC-3501-001
Process track Issuance
DOE JACO
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 23 Sep 10 - 22 Sep 17
Assessment opinion Assessment opinion (1189 KB)
Revised PDD Revised PDD (3853 KB)   Revised PDD - track changes (3571 KB)
Supplementary documents Appendix 1 - IRR Re-Calculations - Zafarana 8 Wind Power Plant Project.xlsx (164 KB)
Signed form Signed form (884 KB)
DOE clarification
VVS version VVS 2.0
Current status 21 Jan 13 - Approved
Effective approval date: 21 Jan 13
Historic statuses 21 Dec 12 - Request published