02:44 29 Oct 25
Project:
5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility
- Request for post-registration changes
| Project | 5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility |
|---|---|
| PRC ref | PRC-5979-001 |
| Process track | Prior approval |
| DOE | BVI |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 10 May 12 - 09 May 19 |
| Assessment opinion |
Assessment opinion (392 KB)
|
| Revised PDD |
Revised PDD (926 KB)
Revised PDD - track changes (998 KB)
|
| Supplementary documents |
Appendix 1 - SSC_CPA_DD_Biotech_18-05-2015- Clean.pdf (1720 KB)
Appendix 2 - SSC_CPA_DD_Biotech_18-05-2015- TC.pdf (1774 KB)
Appendix 3 - SSC_CPA_DD_Marcela_18-05-2015-Clean.pdf (1171 KB)
Appendix 4 - SSC_CPA_DD_Marcela_18-05-2015-TC.pdf (1135 KB)
Appendix 5 - 5979- CPA1_CER Sheet_6Oct2014 .xls (92 KB)
Appendix 6 - Emission Reduction Spreadsheet - CPA 1.xls (92 KB)
Appendix 7 - Response to UNFCCC comment - WB PRC - POA 5979.pdf (106 KB)
|
| Signed form |
Signed form (33 KB)
|
| DOE clarification |
DOE clarification 1 - Clarification - world Bank LBP project_WB - 5979.pdf (76 KB)
DOE clarification 2 - Clarification - world Bank LBP project_WB - 5979.pdf (79 KB)
|
| VVS version | VVS 7.0 |
| Current status | 29 Jun 15 -
Approved
Effective approval date: 26 Jun 15
|
| Historic statuses |
15 Apr 15 -
Published 13 May 15 - Awaiting DOE clarifications 25 May 15 - DOE clarifications received 25 May 15 - Summary note being prepared 05 Jun 15 - Awaiting EB decision |

Assessment opinion
Appendix 5 - 5979- CPA1_CER Sheet_6Oct2014 .xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: