Project: 5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility - Request for post-registration changes
Project 5979 Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility
PRC ref PRC-5979-001
Process track Prior approval
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 May 12 - 09 May 19
Assessment opinion Assessment opinion (392 KB)
Revised PDD Revised PDD (926 KB)   Revised PDD - track changes (998 KB)
Supplementary documents Appendix 1 - SSC_CPA_DD_Biotech_18-05-2015- Clean.pdf (1720 KB)
Appendix 2 - SSC_CPA_DD_Biotech_18-05-2015- TC.pdf (1774 KB)
Appendix 3 - SSC_CPA_DD_Marcela_18-05-2015-Clean.pdf (1171 KB)
Appendix 4 - SSC_CPA_DD_Marcela_18-05-2015-TC.pdf (1135 KB)
Appendix 5 - 5979- CPA1_CER Sheet_6Oct2014 .xls (92 KB)
Appendix 6 - Emission Reduction Spreadsheet - CPA 1.xls (92 KB)
Appendix 7 - Response to UNFCCC comment - WB PRC - POA 5979.pdf (106 KB)
Signed form Signed form (33 KB)
DOE clarification DOE clarification 1 - Clarification - world Bank LBP project_WB - 5979.pdf (76 KB)
DOE clarification 2 - Clarification - world Bank LBP project_WB - 5979.pdf (79 KB)
VVS version VVS 7.0
Current status 29 Jun 15 - Approved
Effective approval date: 26 Jun 15
Historic statuses 15 Apr 15 - Published
13 May 15 - Awaiting DOE clarifications
25 May 15 - DOE clarifications received
25 May 15 - Summary note being prepared
05 Jun 15 - Awaiting EB decision