Project: 8712 Maesod Wastewater Treatment and Biogas Utilisation Project - Request for post-registration changes
Project 8712 Maesod Wastewater Treatment and Biogas Utilisation Project
PRC ref PRC-8712-002
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 20 Dec 2014 - 30 Nov 2017
Assessment opinion Assessment opinion (292 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (298 KB)
DOE clarification
VVS version VVS 2.0
Current status 01 Dec 17 - Approved
Effective approval date: 01 Dec 17
Historic statuses 02 Nov 17 - Request published