Project: 2727 Golden Hope Composting Project - Pekaka. - Request for post-registration changes
Project 2727 Golden Hope Composting Project - Pekaka.
PRC ref PRC-2727-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 05 Jan 2010 - 30 Sep 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 05 Jan 10 - 04 Jan 17
Assessment opinion Assessment opinion (256 KB)
Revised PDD Revised PDD (767 KB)   Revised PDD - track changes (953 KB)
Supplementary documents Appendix 1 - 20120125_FEASIBILITY STUDY PEKAKA - actual compost 2010-11_DEM.xls (373 KB)
Appendix 2 - 20120125_FEASIBILITY STUDY PEKAKA - actual FFB 2010-11_DEM.xls (381 KB)
Signed form Signed form (226 KB)
DOE clarification DOE clarification 1 - 20120928_PEKAKA SSCPDD GH COMPOSTING III F ver27_clean.pdf (767 KB)
DOE clarification 2 - 20120928_PEKAKA SSCPDD GH COMPOSTING III F ver27_track change.pdf (824 KB)
DOE clarification 3 - 20121004_CER estimation Pekaka_05012010 - 30092011_ver11_weighted average.xls (2546 KB)
VVS version VVS 2.0
Current status 27 Dec 12 - Approved
Effective approval date: 27 Dec 12
Historic statuses 30 Aug 12 - Published
24 Sep 12 - Awaiting DOE clarifications
08 Oct 12 - DOE clarifications received
08 Oct 12 - Summary note being prepared
06 Dec 12 - Awaiting EB decision