05:40 11 Nov 25
Project:
3521 Zhejiang Wencheng Baiwanshan Small-Scale Hydropower Project
- Request for post-registration changes
| Project | 3521 Zhejiang Wencheng Baiwanshan Small-Scale Hydropower Project |
|---|---|
| PRC ref | PRC-3521-001 |
| Process track | Prior approval |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 22 Sep 10 - 21 Sep 17 |
| Assessment opinion |
Assessment opinion (580 KB)
|
| Revised PDD |
Revised PDD (547 KB)
Revised PDD - track changes (681 KB)
|
| Supplementary documents |
Appendix 1 - MP revision Wenchegn Baiwanshan hydro_clean.pdf (175 KB)
|
| Signed form |
Signed form (90 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 27 Dec 12 -
Approved
Effective approval date: 25 Dec 12
|
| Historic statuses |
20 Nov 12 -
Published 20 Nov 12 - Summary note being prepared 04 Dec 12 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: