Project: 3521 Zhejiang Wencheng Baiwanshan Small-Scale Hydropower Project - Request for post-registration changes
Project 3521 Zhejiang Wencheng Baiwanshan Small-Scale Hydropower Project
PRC ref PRC-3521-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 22 Sep 10 - 21 Sep 17
Assessment opinion Assessment opinion (580 KB)
Revised PDD Revised PDD (547 KB)   Revised PDD - track changes (681 KB)
Supplementary documents Appendix 1 - MP revision Wenchegn Baiwanshan hydro_clean.pdf (175 KB)
Signed form Signed form (90 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Dec 12 - Approved
Effective approval date: 25 Dec 12
Historic statuses 20 Nov 12 - Published
20 Nov 12 - Summary note being prepared
04 Dec 12 - Awaiting EB decision