Project: 3267 Fujian Longyan Tingzhou Hydropower Station Project - Request for post-registration changes
Project 3267 Fujian Longyan Tingzhou Hydropower Station Project
PRC ref PRC-3267-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 14 Dec 10 - 13 Dec 17
Assessment opinion Assessment opinion (218 KB)
Revised PDD Revised PDD (1225 KB)   Revised PDD - track changes (1226 KB)
Supplementary documents
Signed form Signed form (369 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Jan 13 - Approved
Effective approval date: 07 Jan 13
Historic statuses 07 Dec 12 - Request published