Project: 4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia - Request for post-registration changes
Project 4678 Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia
PRC ref PRC-4678-002
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 26 Oct 2014 - 31 Mar 2015
Assessment opinion Assessment opinion (467 KB)
Revised PDD  
Supplementary documents Appendix 1 - IE-MR2-ERsheet v3_16062016_deviation.xlsx (94 KB)
Signed form Signed form (175 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Nov 16 - Approved
Effective approval date: 15 Nov 16
Historic statuses 11 Oct 16 - Published
11 Oct 16 - Summary note being prepared
26 Oct 16 - Awaiting EB decision