Project: 10181 Small scale Allahabad JFM A/R CDM Project on degraded lands in Allahabad Forest Division, Uttar Pradesh, India - Request for post-registration changes
Project 10181 Small scale Allahabad JFM A/R CDM Project on degraded lands in Allahabad Forest Division, Uttar Pradesh, India
PRC ref PRC-10181-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Feb 2012 - 05 Feb 2018

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 12 - 31 Dec 31
Assessment opinion Assessment opinion (679 KB)
Revised PDD Revised PDD (16 KB)   Revised PDD - track changes (16 KB)
Supplementary documents
Signed form Signed form (41 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 28 Jan 19 - Approved
Effective approval date: 28 Jan 19
Historic statuses 28 Dec 18 - Request published