Project: 6103 Tra Xom Hydropower Project - Request for post-registration changes
Project 6103 Tra Xom Hydropower Project
PRC ref PRC-6103-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jul 12 - 30 Jun 19
Assessment opinion Assessment opinion (406 KB)
Revised PDD Revised PDD (1655 KB)   Revised PDD - track changes (1681 KB)
Supplementary documents
Signed form
DOE clarification
VVS version VVS 9.0
Current status 04 Dec 15 - Approved
Effective approval date: 04 Dec 15
Historic statuses 05 Nov 15 - Request published