Project:
5082 Lopburi Solar Power Plant Project
- Request for post-registration changes
Project | 5082 Lopburi Solar Power Plant Project |
---|---|
PRC ref | PRC-5082-001 |
Process track | Issuance |
DOE | GLC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 01 Jan 12 - 31 Dec 18 |
Assessment opinion | Assessment opinion (524 KB) |
Revised PDD | Revised PDD (1050 KB) Revised PDD - track changes (1076 KB) |
Supplementary documents |
Appendix 1 - 03e LSP_revised ex-ante ER calculations (Ver2.0) 2014.02.07.xlsx (28 KB)
|
Signed form | Signed form (1137 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 05 Jun 14 -
Approved
Effective approval date: 05 Jun 14
|
Historic statuses |
07 May 14 -
Request published |