Project: 8530 60MW Solar PV - Monte Plata - Request for post-registration changes
Project 8530 60MW Solar PV - Monte Plata
PRC ref PRC-8530-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 31 May 2015
Applicable crediting period 31 May 15 - 30 May 25
Assessment opinion Assessment opinion (615 KB)
Revised PDD Revised PDD (1115 KB)   Revised PDD - track changes (1351 KB)
Supplementary documents Appendix 1 - 8530_RD EF model_validation_17-07-17_V2.xls (670 KB)
Appendix 2 - CDM Registered LoA 60MW Solar PV - Monte Plata.pdf (124 KB)
Appendix 3 - CNCCMDL-0505-018-LoA Project 60MW SOLAR PV-MONTE PLATA.pdf (558 KB)
Appendix 4 - LoA Switzerland Monte Plata 2017.pdf (374 KB)
Appendix 5 - MOC-FORM Annex 2 form.pdf (509 KB)
Signed form Signed form (50 KB)
DOE clarification DOE clarification 1 - 8530_Clarification response_DOE.pdf (166 KB)
VVS version VVS-PA 1.0
Current status 05 Dec 18 - Approved with CER limit
Effective approval date: 29 Nov 18
Historic statuses 08 Nov 17 - Published
22 Nov 17 - Awaiting DOE clarifications
24 Aug 18 - DOE clarifications received
24 Aug 18 - Summary note being prepared
06 Sep 18 - Request added to EB101 meeting agenda