Project: 1228 Waste Gas based Captive Power Plant in Liangang Group - Request for post-registration changes
Project 1228 Waste Gas based Captive Power Plant in Liangang Group
PRC ref PRC-1228-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 20 Dec 07 - 19 Dec 17
Assessment opinion Assessment opinion (48 KB)
Revised PDD Revised PDD (571 KB)   Revised PDD - track changes (571 KB)
Supplementary documents
Signed form Signed form (168 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Mar 13 - Approved
Effective approval date: 20 Mar 13