Project: 3057 Qichun Kaidi Biomass Power Project - Request for post-registration changes
Project 3057 Qichun Kaidi Biomass Power Project
PRC ref PRC-3057-002
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 15 Jan 11 - 14 Jan 18
Assessment opinion Assessment opinion (122 KB)
Revised PDD Revised PDD (908 KB)   Revised PDD - track changes (909 KB)
Supplementary documents Appendix 1 - 5_Qichun_ER_for PRC(for submission).xls (68 KB)
Appendix 2 - 6_Qichun_Project IRR_ with present price(new uploaded).xls (141 KB)
Appendix 3 - 6_Qichun_Project IRR_with original price(new uploaded).xls (140 KB)
Signed form Signed form (167 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Mar 13 - Approved
Effective approval date: 25 Mar 13
Historic statuses 22 Feb 13 - Request published