09:58 26 Jan 25
Project:
2897 Egypt Vehicle Scrapping and Recycling Program
- Request for post-registration changes
Project | 2897 Egypt Vehicle Scrapping and Recycling Program |
---|---|
PRC ref | PRC-2897-002 |
Process track | Prior approval |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 11 May 11 - 10 May 18 |
Assessment opinion | Assessment opinion (373 KB) |
Revised PDD | Revised PDD (1144 KB) Revised PDD - track changes (1155 KB) |
Supplementary documents |
Appendix 1 - Egypt CPA 1 20160111_clean.pdf (755 KB)
Appendix 2 - Egypt CPA 1 20160111_tracked changes.pdf (868 KB) Appendix 3 - Egypt CPA 2 20160111_clean.pdf (1055 KB) Appendix 4 - Egypt CPA 2 20160111_tracked changes.pdf (1176 KB) Appendix 5 - Egypt CPA3 201601011_clean.pdf (974 KB) Appendix 6 - Egypt CPA3 20160111_tracked changes.pdf (1098 KB) Appendix 7 - PoA 2897 CPA1_CER Calculation.xls (535 KB) Appendix 8 - PoA 2897 CPA2_CER Calculation.xls (241 KB) Appendix 9 - PoA 2897 CPA3_CER Calculation.xls (380 KB) |
Signed form | Signed form (411 KB) |
DOE clarification |
DOE clarification 1 - AENOR response Request for clarifications.pdf (135 KB)
DOE clarification 2 - letter car models 2.pdf (405 KB) |
VVS version | VVS 2.0 |
Current status | 17 Feb 16 -
Approved
Effective approval date: 16 Feb 16
|
Historic statuses |
22 Dec 15 -
Published 04 Jan 16 - Awaiting DOE clarifications 15 Jan 16 - DOE clarifications received 15 Jan 16 - Summary note being prepared 27 Jan 16 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: