Project: 2897 Egypt Vehicle Scrapping and Recycling Program - Request for post-registration changes
Project 2897 Egypt Vehicle Scrapping and Recycling Program
PRC ref PRC-2897-002
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 11 May 11 - 10 May 18
Assessment opinion Assessment opinion (373 KB)
Revised PDD Revised PDD (1144 KB)   Revised PDD - track changes (1155 KB)
Supplementary documents Appendix 1 - Egypt CPA 1 20160111_clean.pdf (755 KB)
Appendix 2 - Egypt CPA 1 20160111_tracked changes.pdf (868 KB)
Appendix 3 - Egypt CPA 2 20160111_clean.pdf (1055 KB)
Appendix 4 - Egypt CPA 2 20160111_tracked changes.pdf (1176 KB)
Appendix 5 - Egypt CPA3 201601011_clean.pdf (974 KB)
Appendix 6 - Egypt CPA3 20160111_tracked changes.pdf (1098 KB)
Appendix 7 - PoA 2897 CPA1_CER Calculation.xls (535 KB)
Appendix 8 - PoA 2897 CPA2_CER Calculation.xls (241 KB)
Appendix 9 - PoA 2897 CPA3_CER Calculation.xls (380 KB)
Signed form Signed form (411 KB)
DOE clarification DOE clarification 1 - AENOR response Request for clarifications.pdf (135 KB)
DOE clarification 2 - letter car models 2.pdf (405 KB)

VVS version VVS 2.0
Current status 17 Feb 16 - Approved
Effective approval date: 16 Feb 16
Historic statuses 22 Dec 15 - Published
04 Jan 16 - Awaiting DOE clarifications
15 Jan 16 - DOE clarifications received
15 Jan 16 - Summary note being prepared
27 Jan 16 - Awaiting EB decision