Project: 2539 Sichuan Jinxi Hydropower Project - Request for post-registration changes
Project 2539 Sichuan Jinxi Hydropower Project
PRC ref PRC-2539-001
Process track Prior approval
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Sep 09 - 31 Aug 16
Assessment opinion Assessment opinion (189 KB)
Revised PDD Revised PDD (2432 KB)   Revised PDD - track changes (888 KB)
Supplementary documents Appendix 1 - Annex 1 Electricity Division Agreement.pdf (501 KB)
Appendix 2 - Annex 2 Notification by the Grid Company.pdf (8044 KB)
Appendix 3 - Annex 3 Explanation on Transmission Line Connection and Electricity.pdf (128 KB)
Signed form Signed form (375 KB)
DOE clarification
VVS version VVS 2.0
Current status 05 Dec 12 - Approved
Effective approval date: 04 Dec 12
Historic statuses 30 Oct 12 - Published
30 Oct 12 - Summary note being prepared
13 Nov 12 - Awaiting EB decision