Project: 1253 Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) - Request for post-registration changes
Project 1253 Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW)
PRC ref PRC-1253-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 29 Oct 15 - 28 Oct 22
Assessment opinion Assessment opinion (149 KB)
Revised PDD Revised PDD (614 KB)   Revised PDD - track changes (629 KB)
Supplementary documents
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 27 Mar 19 - Approved
Effective approval date: 27 Mar 19
Historic statuses 26 Feb 19 - Request published