Project:
1253 Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW)
- Request for post-registration changes
Project | 1253 Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) |
---|---|
PRC ref | PRC-1253-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 29 Oct 15 - 28 Oct 22 |
Assessment opinion | Assessment opinion (149 KB) |
Revised PDD | Revised PDD (614 KB) Revised PDD - track changes (629 KB) |
Supplementary documents | |
Signed form | Signed form (32 KB) |
DOE clarification | |
VVS version | VVS-PA 1.0 |
Current status | 27 Mar 19 -
Approved
Effective approval date: 27 Mar 19
|
Historic statuses |
26 Feb 19 -
Request published |