18:01 07 Jan 25
Project:
4988 El General Hydroelectric Project
- Request for post-registration changes
Project | 4988 El General Hydroelectric Project |
---|---|
PRC ref | PRC-4988-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 27 Mar 12 - 26 Mar 19 |
Assessment opinion | Assessment opinion (626 KB) |
Revised PDD | Revised PDD (906 KB) Revised PDD - track changes (1682 KB) |
Supplementary documents |
Appendix 1 - PDD_form05 ElGeneral PDD_v9 3 November 11 2013 (without track control).pdf (1812 KB)
Appendix 2 - PDD_form05 ElGeneral PDD_v9 3 November 11 2013 (track control).pdf (1813 KB) |
Signed form | Signed form (2386 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 04 Apr 14 -
Approved
Effective approval date: 04 Apr 14
|
Historic statuses |
06 Mar 14 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: