09:33 04 Dec 24
Project:
0198 San Jacinto Tizate geothermal project
- Request for post-registration changes
Project | 0198 San Jacinto Tizate geothermal project |
---|---|
PRC ref | PRC-0198-001 |
Process track | Prior approval |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Jun 05 - 31 May 12 |
Assessment opinion | Assessment opinion (726 KB) |
Revised PDD | Revised PDD (1073 KB) Revised PDD - track changes (1160 KB) |
Supplementary documents |
Appendix 1 - San Jacinto ERs 1st Credit Period Rev 2.xlsx (12 KB)
Appendix 2 - Investment Analysis San Jacinto-Tizate.xlsx (147 KB) |
Signed form | Signed form (135 KB) |
DOE clarification |
DOE clarification 1 - Validation Report PRC San Jacinto 03022017_Clarifications_Tracked changes.pdf (727 KB)
|
VVS version | VVS 9.0 |
Current status | 08 Jun 17 -
Approved
Effective approval date: 06 Jun 17
|
Historic statuses |
03 Apr 17 -
Published 19 Apr 17 - Awaiting DOE clarifications 03 May 17 - DOE clarifications received 03 May 17 - Summary note being prepared 17 May 17 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: