Project: 0198 San Jacinto Tizate geothermal project - Request for post-registration changes
Project 0198 San Jacinto Tizate geothermal project
PRC ref PRC-0198-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 01 Jun 05 - 31 May 12
Assessment opinion Assessment opinion (726 KB)
Revised PDD Revised PDD (1073 KB)   Revised PDD - track changes (1160 KB)
Supplementary documents Appendix 1 - San Jacinto ERs 1st Credit Period Rev 2.xlsx (12 KB)
Appendix 2 - Investment Analysis San Jacinto-Tizate.xlsx (147 KB)
Signed form Signed form (135 KB)
DOE clarification DOE clarification 1 - Validation Report PRC San Jacinto 03022017_Clarifications_Tracked changes.pdf (727 KB)
VVS version VVS 9.0
Current status 08 Jun 17 - Approved
Effective approval date: 06 Jun 17
Historic statuses 03 Apr 17 - Published
19 Apr 17 - Awaiting DOE clarifications
03 May 17 - DOE clarifications received
03 May 17 - Summary note being prepared
17 May 17 - Awaiting EB decision