09:01 01 Jan 25
Project:
6652 Orosi Wind Power Project
- Request for post-registration changes
Project | 6652 Orosi Wind Power Project |
---|---|
PRC ref | PRC-6652-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 15 Jan 15 - 14 Jan 22 |
Assessment opinion | Assessment opinion (733 KB) |
Revised PDD | Revised PDD (1491 KB) Revised PDD - track changes (793 KB) |
Supplementary documents |
Appendix 1 - Orosi additionality calculations Ver-4 20140930.xlsx (140 KB)
Appendix 2 - 6652 EF Calculation_revised.xlsx (4782 KB) |
Signed form | Signed form (33 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 19 Feb 15 -
Approved
Effective approval date: 17 Feb 15
|
Historic statuses |
13 Jan 15 -
Published 13 Jan 15 - Summary note being prepared 27 Jan 15 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: