Project: 6652 Orosi Wind Power Project - Request for post-registration changes
Project 6652 Orosi Wind Power Project
PRC ref PRC-6652-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 15 Jan 2015
Applicable crediting period 15 Jan 15 - 14 Jan 22
Assessment opinion Assessment opinion (733 KB)
Revised PDD Revised PDD (1491 KB)   Revised PDD - track changes (793 KB)
Supplementary documents Appendix 1 - Orosi additionality calculations Ver-4 20140930.xlsx (140 KB)
Appendix 2 - 6652 EF Calculation_revised.xlsx (4782 KB)
Signed form Signed form (33 KB)
DOE clarification
VVS version VVS 7.0
Current status 19 Feb 15 - Approved
Effective approval date: 17 Feb 15
Historic statuses 13 Jan 15 - Published
13 Jan 15 - Summary note being prepared
27 Jan 15 - Awaiting EB decision