06:01 11 Jan 25
Project:
0594 5MW Renewable Energy Project for grid, Gansu Province, China
- Request for post-registration changes
Project | 0594 5MW Renewable Energy Project for grid, Gansu Province, China |
---|---|
PRC ref | PRC-0594-001 |
Process track | Issuance |
DOE | GLC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 01 Apr 07 - 31 Mar 14 |
Assessment opinion | Assessment opinion (70 KB) |
Revised PDD | Revised PDD (1067 KB) Revised PDD - track changes (658 KB) |
Supplementary documents |
Appendix 1 - IRR original_0594(registered PDD).xls (110 KB)
Appendix 2 - IRR updated_0594(based on revised PDD).xls (137 KB) |
Signed form | Signed form (683 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 10 Dec 12 -
Approved
Effective approval date: 10 Dec 12
|
Historic statuses |
09 Nov 12 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: