02:53 11 Nov 25
Project:
8248 A Luoi Hydro Power Project
- Request for post-registration changes
| Project | 8248 A Luoi Hydro Power Project |
|---|---|
| PRC ref | PRC-8248-001 |
| Process track | Issuance |
| DOE | LRQA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 20 Nov 12 - 19 Nov 19 |
| Assessment opinion |
Assessment opinion (76 KB)
|
| Revised PDD |
Revised PDD (948 KB)
Revised PDD - track changes (994 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (800 KB)
|
| DOE clarification | |
| Current status | 15 Apr 15 -
Approved
Effective approval date: 15 Apr 15
|
| Historic statuses |
17 Mar 15 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: