Project: 8248 A Luoi Hydro Power Project - Request for post-registration changes
Project 8248 A Luoi Hydro Power Project
PRC ref PRC-8248-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 20 Nov 2012 - 12 Apr 2013

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 20 Nov 12 - 19 Nov 19
Assessment opinion Assessment opinion (76 KB)
Revised PDD Revised PDD (948 KB)   Revised PDD - track changes (994 KB)
Supplementary documents
Signed form Signed form (800 KB)
DOE clarification
Current status 15 Apr 15 - Approved
Effective approval date: 15 Apr 15
Historic statuses 17 Mar 15 - Request published