Project: 2041 Huangtuwan Hydropower Project in Gansu Province - Request for post-registration changes
Project 2041 Huangtuwan Hydropower Project in Gansu Province
PRC ref PRC-2041-002
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 19 Dec 10 - 18 Dec 17
Assessment opinion Assessment opinion (663 KB)
Revised PDD Revised PDD (441 KB)   Revised PDD - track changes (449 KB)
Supplementary documents
Signed form Signed form (53 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Sep 13 - Approved
Effective approval date: 04 Sep 13
Historic statuses 06 Aug 13 - Request published