Project: 3816 Guanaquitas 9.74 MW Hydroelectric project - Request for post-registration changes
Project 3816 Guanaquitas 9.74 MW Hydroelectric project
PRC ref PRC-3816-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 03 Oct 13 - 02 Oct 20
Assessment opinion Assessment opinion (191 KB)
Revised PDD Revised PDD (906 KB)   Revised PDD - track changes (914 KB)
Supplementary documents
Signed form Signed form (144 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Oct 18 - Approved
Effective approval date: 04 Oct 18
Historic statuses 04 Sep 18 - Request published