Project:
3816 Guanaquitas 9.74 MW Hydroelectric project
- Request for post-registration changes
| Project | 3816 Guanaquitas 9.74 MW Hydroelectric project |
|---|---|
| PRC ref | PRC-3816-001 |
| Process track | Issuance |
| DOE | EPIC |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 03 Oct 13 - 02 Oct 20 |
| Assessment opinion |
Assessment opinion (191 KB)
|
| Revised PDD |
Revised PDD (906 KB)
Revised PDD - track changes (914 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (144 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 04 Oct 18 -
Approved
Effective approval date: 04 Oct 18
|