Project:
3347 Caruquia 9.76 MW Hydroelectric project
- Request for post-registration changes
Project | 3347 Caruquia 9.76 MW Hydroelectric project |
---|---|
PRC ref | PRC-3347-001 |
Process track | Issuance |
DOE | EPIC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 18 Apr 11 - 16 Jan 18 |
Assessment opinion | Assessment opinion (191 KB) |
Revised PDD | Revised PDD (1142 KB) Revised PDD - track changes (1125 KB) |
Supplementary documents | |
Signed form | Signed form (144 KB) |
DOE clarification | |
VVS version | VVS-PA 1.0 |
Current status | 19 Sep 18 -
Approved
Effective approval date: 19 Sep 18
|
Historic statuses |
21 Aug 18 -
Request published |