23:03 14 Nov 25
Project:
0675 Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA)
- Request for post-registration changes
| Project | 0675 Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA) |
|---|---|
| PRC ref | PRC-0675-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 03 Jun 03 - 02 Jun 13 |
| Assessment opinion |
Assessment opinion (857 KB)
|
| Revised PDD |
Revised PDD (3199 KB)
Revised PDD - track changes (3024 KB)
|
| Supplementary documents |
Appendix 1 - Boiler 1.pdf (2795 KB)
Appendix 2 - Boiler 2 and 3.pdf (519 KB)
Appendix 3 - Lagoon Depth 2nd Monitoring Period.xlsx (35 KB) Appendix 4 - Maximum Depth for the El Martirio Lagoon.pdf (163 KB)
Appendix 5 - Extract of Measurements from Flow Meter to Laminar Irrigation for December 09 - January 2010.xls (25 MB)
|
| Signed form |
Signed form (119 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 28 May 14 -
Approved
Effective approval date: 25 May 14
|
| Historic statuses |
15 Apr 14 -
Published 15 Apr 14 - Summary note being prepared 05 May 14 - Awaiting EB decision |

Assessment opinion
Appendix 5 - Extract of Measurements from Flow Meter to Laminar Irrigation for December 09 - January 2010.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: