Project: 0675 Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA) - Request for post-registration changes
Project 0675 Vinasse Anaerobic Treatment Project - Compañía Licorera de Nicaragua, S. A. (CLNSA)
PRC ref PRC-0675-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 03 Jun 03 - 02 Jun 13
Assessment opinion Assessment opinion (857 KB)
Revised PDD Revised PDD (3199 KB)   Revised PDD - track changes (3024 KB)
Supplementary documents Appendix 1 - Boiler 1.pdf (2795 KB)
Appendix 2 - Boiler 2 and 3.pdf (519 KB)
Appendix 3 - Lagoon Depth 2nd Monitoring Period.xlsx (35 KB)
Appendix 4 - Maximum Depth for the El Martirio Lagoon.pdf (163 KB)
Appendix 5 - Extract of Measurements from Flow Meter to Laminar Irrigation for December 09 - January 2010.xls (25 MB)
Signed form Signed form (119 KB)
DOE clarification
VVS version VVS 2.0
Current status 28 May 14 - Approved
Effective approval date: 25 May 14
Historic statuses 15 Apr 14 - Published
15 Apr 14 - Summary note being prepared
05 May 14 - Awaiting EB decision