Project: 7040 5.5MW Bundled Photovoltaic power generation project in KOWEPO - Request for post-registration changes
Project 7040 5.5MW Bundled Photovoltaic power generation project in KOWEPO
PRC ref PRC-7040-001
Process track Issuance
DOE KSA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:, Complementary technologies/measures
Applicable crediting period 31 Aug 12 - 30 Aug 22
Assessment opinion Assessment opinion (570 KB)
Revised PDD Revised PDD (4837 KB)   Revised PDD - track changes (4901 KB)
Supplementary documents
Signed form Signed form (140 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 23 Feb 24 - Approved
Effective approval date: 23 Feb 24
Historic statuses 25 Jan 24 - Request published