Project: 9361 Parque Talinay Oriente - Request for post-registration changes
Project 9361 Parque Talinay Oriente
PRC ref PRC-9361-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2013 - 31 Dec 2019

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 13 - 31 Dec 19
Assessment opinion Assessment opinion (394 KB)
Revised PDD Revised PDD (2368 KB)   Revised PDD - track changes (2377 KB)
Supplementary documents
Signed form Signed form (250 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 01 Sep 26 - Approved
Effective approval date: 01 Sep 26
Historic statuses 03 Aug 26 - Request published