23:22 08 Nov 24
Project:
2151 Yunnan Leidatan 108MW Hydropower Project
- Request for post-registration changes
Project | 2151 Yunnan Leidatan 108MW Hydropower Project |
---|---|
PRC ref | PRC-2151-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 09 Feb 09 - 08 Feb 16 |
Assessment opinion | Assessment opinion (145 KB) |
Revised PDD | Revised PDD (634 KB) Revised PDD - track changes (635 KB) |
Supplementary documents | |
Signed form | Signed form (1785 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 15 Apr 13 -
Approved
Effective approval date: 15 Apr 13
|
Historic statuses |
15 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: