5900 Inner Mongolia China Water Group Huade Heping Wind Farm 49.5MW Project
- Request for post-registration changes
| Project | 5900 Inner Mongolia China Water Group Huade Heping Wind Farm 49.5MW Project |
|---|---|
| PRC ref | PRC-5900-001 |
| Process track | Issuance |
| DOE | CTI Certification |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Apr 12 - 31 Mar 22 |
| Assessment opinion |
Assessment opinion (154 KB)
|
| Revised PDD |
Revised PDD (968 KB)
Revised PDD - track changes (968 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (909 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 21 Nov 14 -
Approved
Effective approval date: 21 Nov 14
|
| Historic statuses |
23 Oct 14 -
Request published |