Project: 8712 Maesod Wastewater Treatment and Biogas Utilisation Project - Request for post-registration changes
Project 8712 Maesod Wastewater Treatment and Biogas Utilisation Project
PRC ref PRC-8712-001
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 22 Mar 2013 - 19 Dec 2014
Assessment opinion Assessment opinion (828 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (211 KB)
DOE clarification
Current status 15 May 15 - Approved
Effective approval date: 15 May 15
Historic statuses 16 Apr 15 - Request published