Project: 0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project - Request for post-registration changes
Project 0763 Al-Shaheen Oil Field Gas Recovery and Utilization Project
PRC ref PRC-0763-002
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2016 - 31 Dec 2018
Assessment opinion Assessment opinion (309 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (150 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 20 Apr 21 - Approved
Effective approval date: 20 Apr 21
Historic statuses 22 Mar 21 - Request published