Project: 3745 Su Pan 2 Hydro Power Project - Request for post-registration changes
Project 3745 Su Pan 2 Hydro Power Project
PRC ref PRC-3745-001
Process track Prior approval
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Change to the start date of the crediting period
  • Proposed start date of crediting period: 30 Dec 2011
Assessment opinion Assessment opinion (144 KB)
Revised PDD  
Supplementary documents Appendix 1 - Annex 1 Report on Implementation of progress and commitment to complete Su Pan 2 Hydropower Project.PDF (121 KB)
Appendix 2 - Annex 2 Minutes of Field Verification on Landslide Incidents in Penstock of Su Pan 2 Hydropower.pdf (1346 KB)
Appendix 3 - Annex 3 Newspaper article regarding the trial run start date of the 3rd Unit.pdf (129 KB)
Appendix 4 - Annex 4 Commission date for unit 3.pdf (34 KB)
Appendix 5 - Annex 5 Commission date for unit 2.pdf (68 KB)
Signed form Signed form (392 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 05 Aug 13
Historic statuses 10 Jul 13 - Published
10 Jul 13 - Summary note being prepared
15 Jul 13 - Awaiting EB decision