Project: 0008 Brazil NovaGerar Landfill Gas to Energy Project - Request for post-registration changes
Project 0008 Brazil NovaGerar Landfill Gas to Energy Project
PRC ref PRC-0008-007
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Nov 2020 - 31 Dec 2020

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 01 Jul 18 - 30 Jun 25
Assessment opinion Assessment opinion (503 KB)
Revised PDD Revised PDD (1826 KB)   Revised PDD - track changes (1802 KB)
Supplementary documents Appendix 1 - NI document.pdf (1508 KB)
Appendix 2 - Updated CERs exante Rev V5.xls (564 KB)
Appendix 3 - Updated NovaGerar Cash Flow 2004 v2 2019 11 26 FES Rev V3.xls (1091 KB)
Appendix 4 - Corss Check Vazão e Energia AGGREKO v2.xlsx (12 KB)
Appendix 5 - Motor Jenbacher Datasheet - 1250kW.pdf (358 KB)
Appendix 6 - NOVAGERAR DEVIATION Spreadsheet v2.xlsx (115 KB)
Signed form Signed form (141 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 28 Feb 22 - Approved
Effective approval date: 28 Feb 22
Historic statuses 28 Jan 22 - Request published