03:15 05 Nov 25
Project:
8488 Lebong Hydroelectric Power Plant
- Request for post-registration changes
| Project | 8488 Lebong Hydroelectric Power Plant |
|---|---|
| PRC ref | PRC-8488-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 14 Dec 12 - 13 Dec 19 |
| Assessment opinion |
Assessment opinion (903 KB)
|
| Revised PDD |
Revised PDD (1102 KB)
Revised PDD - track changes (1104 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (70 KB)
|
| DOE clarification | |
| VVS version | VVS 7.0 |
| Current status | 10 May 16 -
Approved
Effective approval date: 10 May 16
|
| Historic statuses |
11 Apr 16 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: