Project: 3079 Hebei Chengde Peifeng Wind Farm Project - Request for post-registration changes
Project 3079 Hebei Chengde Peifeng Wind Farm Project
PRC ref PRC-3079-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Sep 10 - 31 Aug 17
Assessment opinion Assessment opinion (1579 KB)
Revised PDD Revised PDD (521 KB)   Revised PDD - track changes (582 KB)
Supplementary documents Appendix 1 - Investment analysis.zip (47 KB)
Appendix 2 - IRR calculations with reference tariff.zip (37 KB)
Signed form Signed form (53 KB)
DOE clarification
VVS version VVS 2.0
Current status 16 May 13 - Approved
Effective approval date: 16 May 13
Historic statuses 17 Apr 13 - Request published