06:24 28 Dec 24
Project:
3111 Jilin province Zhenlai Heiyupao 49.5MW the first phase wind farm project
- Request for post-registration changes
Project | 3111 Jilin province Zhenlai Heiyupao 49.5MW the first phase wind farm project |
---|---|
PRC ref | PRC-3111-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 30 May 10 - 29 May 17 |
Assessment opinion | Assessment opinion (670 KB) |
Revised PDD | Revised PDD (804 KB) Revised PDD - track changes (811 KB) |
Supplementary documents | |
Signed form | Signed form (94 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 08 May 13 -
Approved
Effective approval date: 08 May 13
|
Historic statuses |
09 Apr 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: