02:43 12 Nov 25
Project:
4718 4.5MW Wind Power Project by Hira Group
- Request for post-registration changes
| Project | 4718 4.5MW Wind Power Project by Hira Group |
|---|---|
| PRC ref | PRC-4718-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (636 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - Final MR_4718_MP01.pdf (336 KB)
Appendix 2 - Final ER Spreadsheet_4718_MP01.xlsx (171 KB)
|
| Signed form |
Signed form (1549 KB)
|
| DOE clarification | |
| VVS version | VVS 7.0 |
| Current status | 29 Mar 16 -
Approved
Effective approval date: 29 Mar 16
|
| Historic statuses |
25 Feb 16 -
Request published |

Assessment opinion
Appendix 2 - Final ER Spreadsheet_4718_MP01.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: